ASSESSMENT OF HEALTH AND SAFETY RISK (OHS) USED OHSAS VARIABLES WITH HIRA, HAZID AND HAZOP METHOD (CASE STUDY OF PROJECT CIPUTRA WORLD PHASE 3, SURABAYA)

Assessment Risiko Kesehatan dan Keselamatan Kerja (K3) Menurut Variabel OHSAS Dengan Menggunakan Metode HIRA, HAZID dan HAZOP (Studi Kasus: Proyek Pembangunan Ciputra World Phase 3, Surabaya)

  • Anita Trisiana University of Jember
  • Dwi Sanjaya Universty of Jember
  • Anik Ratnaningsih Universty of Jember

Abstract

Implementation of the construction project is very necessary for the existence of risk management. It is necessary to anticipate and handle risks in construction projects because of the project's construction one such risk of occupational health and safety (OHS). So the need for the identification, assessment, analysis to anticipate the risks involved. According to OHSAS (18001:2007), OHS is all the conditions and factors that affect, or may affect, on the health and safety of employees or other workers (including contract workers and personnel contractors, or others in the workplace). The purpose of this research is to know the risk factors and the risk of dominant and controlling risks in the project. The methods used in this research is a method of HAZID, HAZOP, and HIRA. The results obtained, there are 48 types of risk factors, 47 with the medium category, and 1 with a low category. There are five dominant risks and 12 risk controls.


Implementation of the construction project is very necessary for the existence of risk management. It is necessary to anticipate and handle risks in construction projects because of the project's construction one such risk of occupational health and safety (OHS). So the need for the identification, assessment, analysis to anticipate the risks involved. According to OHSAS (18001:2007), OHS is all the conditions and factors that affect, or may affect, on the health and safety of employees or other workers (including contract workers and personnel contractors, or others in the workplace). The purpose of this research is to know the risk factors and the risk of dominant and controlling risks in the project. The methods used in this research is a method of HAZID, HAZOP, and HIRA. The results obtained, there are 48 types of risk factors, 47 with the medium category, and 1 with a low category. There are five dominant risks and 12 risk controls.

Author Biographies

Anita Trisiana, University of Jember

Civil Engineering Departement
Faculty of Engineering, University of Jember
Jl. Kalimantan 37 Jember
Corresponding author: anita.teknik@unej.ac.id

Dwi Sanjaya, Universty of Jember

Civil Engineering Undergraduate Study Program
Departement of Civil Engineering
Faculty of Engineering, University of Jember
Jl. Kalimantan 37 Jember

Anik Ratnaningsih, Universty of Jember

Civil Engineering Departement
Faculty of Engineering, University of Jember
Jl. Kalimantan 37 Jember

Published
2019-06-03
How to Cite
TRISIANA, Anita; SANJAYA, Dwi; RATNANINGSIH, Anik. ASSESSMENT OF HEALTH AND SAFETY RISK (OHS) USED OHSAS VARIABLES WITH HIRA, HAZID AND HAZOP METHOD (CASE STUDY OF PROJECT CIPUTRA WORLD PHASE 3, SURABAYA). Jurnal Rekayasa Sipil dan Lingkungan, [S.l.], v. 3, n. 1, p. 28-37, june 2019. ISSN 2548-9518. Available at: <https://jurnal.unej.ac.id/index.php/JRSL/article/view/9324>. Date accessed: 22 dec. 2024. doi: https://doi.org/10.19184/jrsl.v3i1.9324.

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.