THE FEASIBILITY STUDY OF PASURUAN – PROBOLINGGO TOLL ROAD

Studi Kelayakan Pembangunan Tol Pasuruan - Probolinggo

  • Willy Kriswardhana University of Jember
  • Nunung Nuring Hayati University of Jember
  • Ikhwan Tri Kuncahyo University of Jember

Abstract

Pasuruan and Probolinggo Regency is a Regency in East Java which is famous for its tourism and industry, such as mount bromo and the safari park. This makes the Pasuruan regency is experiencing significant economic growth. To smoothen and spur economic growth in this area, the government built the Pasuruan – Probolinggo toll road. The objective of this study is to analyze the existing road traffic of Pasuruan and Probolinggo and doing the feasibility study. Feasibility study is determined based on the value of the ratio between the income investors gained at the cost of build the toll road. The value of these feasibilitystudy based on the analysis of the Net Present Value (NPV), Benefit Cost Ratio (BCR), Internal Rate of Return (IRR) and the Pay Back Period (PBP). Financially value NPV > 1, value of BCR > 0 and the value of the IRR 8.3%. Toll Road construction project – Probolinggo Pasuruan worth financially and economically. Direction for future research is presented.


Kabupaten Pasuruan dan Probolinggo adalah salah satu Kabupaten di Jawa Timur yang terkenal dengan pariwisata dan industrinya, seperti gunung bromo dan taman safari. Hal ini membuat Kabupaten Pasuruan mengalami pertumbuhan ekonomi yang cukup signifikan.  Untuk memperlancar dan memacu pertumbuhan ekonomi di kedua kabupaten tersebut, pemerintah membangun jalan tol Pasuruan – Probolinggo. Tujuan penulisan penelitian ini adalah untuk menganalisis lalu – lintas jalan eksisting Pasuruan – Probolinggo dan melakukan analisis kelayakan secara finansial. Untuk analisis kelayakan secara finansial ditentukan berdasarkan nilai rasio antara income investor yang didapat dengan biaya pembuatan jalan tol. Nilai kelayakan finansial tersebut berdasarkan analisis Net Present Value (NPV), Benefit Cost Ratio (BCR), Internal Rate of Return (IRR) dan Pay Back Period (PBP). Dalam penelitian ini, nilai DS pada Kecamatan Grati dengan nilai DS rata-rata 0.69 dan pada titik Kecamatan Leces dengan DS rata-rata sebesar 0.60. Secara finansial nilai  NPV >1, nilai BCR >0 dan nilai IRR 8.3 %. Sehingga secara finansial proyek Pembangunan Jalan Tol Pasuruan – Probolinggo layak secara finansial. Arah penelitian selanjutnya telah diberikan pada akhir artikel.

Author Biographies

Willy Kriswardhana, University of Jember

Departement of Civil Engineering
Faculty of Engineering, University of Jember
Jl. Kalimantan 37 Jember
Corresponding author: willy.teknik@unej.ac.id

Nunung Nuring Hayati, University of Jember

Departement of Civil Engineering
Faculty of Engineering, University of Jember
Jl. Kalimantan 37 Jember

Ikhwan Tri Kuncahyo, University of Jember

Civil Engineering Undergraduate Study Program
Departement of Civil Engineering
Faculty of Engineering, University of Jember
Jl. Kalimantan 37 Jember

Published
2017-12-07
How to Cite
KRISWARDHANA, Willy; HAYATI, Nunung Nuring; KUNCAHYO, Ikhwan Tri. THE FEASIBILITY STUDY OF PASURUAN – PROBOLINGGO TOLL ROAD. Jurnal Rekayasa Sipil dan Lingkungan, [S.l.], v. 1, n. 02, p. 131-137, dec. 2017. ISSN 2548-9518. Available at: <https://jurnal.unej.ac.id/index.php/JRSL/article/view/5907>. Date accessed: 23 nov. 2024. doi: https://doi.org/10.19184/jrsl.v1i02.5907.

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.