WIHARTI, Wiwik et al. Percepatan Penyelesaian Proyek Menggunakan Metode Fast-Track (Studi Kasus: Proyek Gedung Serbaguna PLBN Entikong Kalimantan Barat). Jurnal Rekayasa Sipil dan Lingkungan, [S.l.], v. 6, n. 1, p. 16-25, june 2022. ISSN 2548-9518. Available at: <https://jurnal.unej.ac.id/index.php/JRSL/article/view/31286>. Date accessed: 22 nov. 2024. doi: https://doi.org/10.19184/jrsl.v6i1.31286.