WIHARTI, Wiwik et al.
Percepatan Penyelesaian Proyek Menggunakan Metode Fast-Track (Studi Kasus: Proyek Gedung Serbaguna PLBN Entikong Kalimantan Barat).
Jurnal Rekayasa Sipil dan Lingkungan, [S.l.], v. 6, n. 1, p. 16-25, june 2022.
ISSN 2548-9518.
Available at: <https://jurnal.unej.ac.id/index.php/JRSL/article/view/31286>. Date accessed: 22 dec. 2024.
doi: https://doi.org/10.19184/jrsl.v6i1.31286.