Perhitungan Waste Material Pada Proyek Pembangunan Gedung ICU RS Ngudi Waluyo Blitar

Calculation of Waste Material In The ICU Building Construction Project Waluyo Blitar Hospital

  • Bintang Ardi Rinengga Universitas Jember
  • Anita Trisiana Universitas Jember
  • Wiwik Yunarni Widiarti Universitas Jember

Abstract

Abstract


Material waste can have a negative impact on building construction projects, especially in the budgeted cost sector. The use of BIM software can help in calculating and optimizing reinforcement work so that excessive material waste does not occur. In this research, building modeling will be carried out using Revit software. The output achieved in processing this data is quantity take-off. The calculation of remaining rebar material in this research uses the Microsoft Excel software program with the aim of finding out the number of rebar mills needed and the combination of cuts in one rebar mill. Structural modeling using BIM Revit aims to determine the shape of the structure in 3D visualization. This visualization makes it easier to model reinforcement, bends, and iron connections. From the modeling results, the take-off amount is obtained. From the results of the Revit take-off quantity, the length of the rod used as a pattern for cutting steel rods 12 meters long is obtained. Next, an analysis of the level of waste and waste costs is carried out. In the construction of the ICU building at Ngudi Waluyo Blitar Regional Hospital, the volume of material for strengthening work was 3,058.57 meters with a total weight of 1,954.88 kg and a waste cost value of IDR 18,888,958. The residual iron content of Ø6 was 2.72%, D8 was 0.48%, D10 was 0.04%, D13 was 4.43%, D16 was 0.35%, and D19 was 1.08%.


Keywords: Waste material, BIM, quantity take off, waste level and waste cost.


Abstrak


Waste material dapat memberikan dampak buruk pada proyek pembangunan gedung, terutama pada sektor biaya yang dianggarkan. Penggunaan software BIM dapat membantu dalam perhitungan dan optimalisasi pada pekerjaan penulangan sehingga tidak terjadi waste material yang berlebih. Pada penelitian ini akan dilakukan pemodelan bangunan dengan Software Revit. Output yang dicapai dalam pengolahan data ini adalah Quantity Take Off. Perhitungan waste material pada tulangan besi dalam penelitian menggunakan program bantu software microsoft excel dengan tujuan untuk mengetahui jumlah los besi yang dibutuhkan dan kombinasi pemotongan dalam satu los besi.Pemodelan struktur menggunakan BIM Revit bertujuan untuk mengetahui bentuk struktur dalam visualisasi 3D. Visualisasi ini mempermudah dalam pemodelan tulangan, tekukan, dan sambungan besi. Dari hasil pemodelan didapatkan quantity take off . Dari hasil quantity take off Revit, maka akan didapatkan bar length yang digunakan sebagai pola pemotongan los besi 12 meter. Selanjutnya dilakukan analisa waste level dan waste cost.Pada konstruksi di gedung ICU RS Ngudi Waluyo Blitar volume waste material pada pekerjaan pembesian sebesar 3.058,57 meter dengan total beratnya adalah 1.954,88 kg dengan nilai waste cost sebesar Rp 18.888.958. Adapun waste level pada besi Ø6 sebesar 2,72%, D8 sebesar 0,48%, D10 sebesar 0,04%, D13 sebesar 4,43%, D16 sebesar 0,35%, D19 sebesar 1,08%.


Kata kunci: Waste material, BIM, quantity take off, waste level dan waste cost.

Author Biographies

Bintang Ardi Rinengga, Universitas Jember

Building Construction Engineering Technology Study Program
Faculty of Engineering, Universitas Jember
Jalan Kalimantan 37 Jember

Anita Trisiana, Universitas Jember

Building Construction Engineering Technology Study Program
Faculty of Engineering, Universitas Jember
Jalan Kalimantan 37 Jember

Wiwik Yunarni Widiarti, Universitas Jember

Building Construction Engineering Technology Study Program
Faculty of Engineering, Universitas Jember
Jalan Kalimantan 37 Jember

References

Audio, B.I. (2023) Analisis Proyek Dengan prinsip Lean Construction Guna Mengendalikan Waste of Material (Studi Kasus : Pembangunan Gedung Research Center Universitas Pembangunan Nasional Veteran Jawa Timur), Skripsi
Asnudin, A. (2010). Pengendalian Sisa Material Konstruksi Pada Pembangunan Rumah Tinggal. Jurnal Mekanika Teknik, 12(3), 162–164.
Badan Standardisasi Nasional. (2002). Tata Cara Perhitungan Struktur Beton Untuk Bangunan Gedung. SNI 03-2847-2002. Bandung: Badan Standardisasi Nasional, 251.
Badan Standardisasi Nasional. (2017). Baja Tulangan Beton. Sni 2052-2017, 13.
Badan Standardisasi Nasional. (2019). Persyaratan Beton Struktural untuk Bangunan Gedung. Sni 2847-2019, 8, 720.
Benshlomo, O. (2023). IMPLEMENTASI BUILDING INFORMATION MODELING (BIM) DALAM ANALISIS WASTE MATERIAL TULANGAN KOLOM PADA GEDUNG SERBAGUNA UNIVERSITAS MITRA INDONESIA. IMPLEMENTASI BUILDING INFORMATION MODELING (BIM) DALAM ANALISIS WASTE MATERIAL TULANGAN KOLOM PADA GEDUNG SERBAGUNA UNIVERSITAS MITRA INDONESIA, 4(1), 88–100.
Fakhruddin, Parung, H., Tjaronge, M. W., Djamaluddin, R., Irmawaty, R., Amiruddin, A. A., Djamaluddin, A. R., Harianto, T., Muhiddin, A. B., Arsyad, A., & Nur, S. H. (2019). Sosialisasi Aplikasi Teknologi Building Information Modelling (BIM) pada Sektor Konstruksi Indonesia. JURNAL TEPAT : Applied Technology Journal for Community Engagement and Services, 2(2), 112–119. https://doi.org/10.25042/jurnal_tepat.v2i2.82
Fikri Hasmori, M., Faizul Md Zin, A., Nagapan, S., Deraman, R., Abas, N., Yunus, R., & Klufallah, M. (2020). The on-site waste minimization practices for construction waste. IOP Conference Series: Materials Science and Engineering, 713(1). https://doi.org/10.1088/1757-899X/713/1/012038
Gulghane, A. A., & Khandve, P. V. (2015). Management for Construction Materials and Control of Construction Waste in Construction Industry: A Review. Journal of Engineering Research and Applications Www.Ijera.Com ISSN, 5(41), 2248–962259.
Hamkah, & Hadi Purwanto, J. R. M. (2019). Jurnal simetrik vol.9, no.2, desember 2019. Jurnal Simetrik, 9(2), 208–214.
Hendra, Deni, Karsono, B., Olivia, S., & Azhar. (2022). Pengenalan Peran Platform Digital Bim ( Building Information Modelling ) Dalam Program Autodesk Revit Bagi Masyarakat Pelajar Kota Lhokseumawe. Jurnal Solusi Masyarakat Dikara, 166–171.
Laily, F. N., Husni, H. R., & Bayzoni, B. (2021). Perbandingan Perhitungan BoQ dengan Menggunakan Revit 2019 Terhadap Perhitungan BoQ dengan Menggunakan Metode Konvensional pada Pekerjaan Struktur (Studi Kasus: Gedung G Fakultas Pertanian Universitas Lampung). REKAYASA: Jurnal Ilmiah Fakultas Teknik Universitas Lampung, 25(2), 27–31. https://doi.org/10.23960/rekrjits.v25i2.30
Luangcharoenrat, C., Intrachooto, S., Peansupap, V., & Sutthinarakorn, W. (2019). Factors influencing construction waste generation in building construction: Thailand’s perspective. Sustainability (Switzerland), 11(13). https://doi.org/10.3390/su11133638
Nurfadillah, Y. K. (2020). Analisis Dan Evaluasi Sisa Material Konstruksi Menggunakan Metode Pareto Dan Fishbone Diagram (Studi Kasus Pada Proyek Pembangunan Gedung Pascasarjana Universitas Islam Malang). Occupational Medicine, 53(4), 130.
Putri, F. F. (2019). Evaluasi Anggaran Biaya Struktur dan Arsitektur Menggunakan Metode Building Information Modeling (BIM) (Studi Kasus : Gedung Integrated Laboratory For Science Policy And Communication IsDB Uneversitas Jember). 1–43.
Rahmawati, D., Firmawan, F., Auliya, M. B., & Martiano, D. (2021). Analisis dan Evaluasi Sisa Material Kontruksi Menggunakan FTA (Fault Tree Analysis) Studi Kasus: Proyek Pembangunan Gedung ICU RSUD Limpung Kabupaten Batang. Pengembangan Rekayasa Dan Teknologi, 17(2), 115–122.
Sinipat, L., & Beatrix, M. (2023). ANALISIS KEBUTUHAN MATERIAL BESI TULANGAN PADA STRUKTUR BETON BERTULANG DENGAN METODE BAR BENDING SCHEDULE PADA PROYEK PEMBANGUNAN SEKOLAH CITA HATI SURABAYA. Jurnal Ilmiah Teknik Dan Manajemen Industri, 3(1), 668–701. https://doi.org/10.46306/tgc.v3i1
Published
2024-06-22
How to Cite
RINENGGA, Bintang Ardi; TRISIANA, Anita; WIDIARTI, Wiwik Yunarni. Perhitungan Waste Material Pada Proyek Pembangunan Gedung ICU RS Ngudi Waluyo Blitar. Jurnal Rekayasa Sipil dan Lingkungan, [S.l.], v. 8, n. 1, p. 15-25, june 2024. ISSN 2548-9518. Available at: <https://jurnal.unej.ac.id/index.php/JRSL/article/view/46172>. Date accessed: 22 dec. 2024. doi: https://doi.org/10.19184/jrsl.v8i1.46172.

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.