Nzita, A., Mizengi, L., Ndiwulu, G., Ngoma, G., Umba-di-Mbudi, C., Ngimbi, R., & Phuati, E. (2024). Statistical Analysis of Electrical Component Aging in Group 6 of the Inga 2 Hydroelectric Plant Following Abrupt Shutdowns. Computational And Experimental Research In Materials And Renewable Energy, 7(2), 78-92. doi:10.19184/cerimre.v7i2.51268