Gazali, Goldy, & Intan Baroroh. " Risk Analysis of the Causes of Delay in Ship Construction (Case Study of KM CL 9E Ship Construction)." BERKALA SAINSTEK [Online], 10.4 (2022): 235-242. Web. 29 Dec. 2024