Gazali, G., & Baroroh, I. (2022). Risk Analysis of the Causes of Delay in Ship Construction (Case Study of KM CL 9E Ship Construction). BERKALA SAINSTEK, 10(4), 235-242. doi:10.19184/bst.v10i4.32674