GAZALI, Goldy Sandy; BAROROH, Intan. Risk Analysis of the Causes of Delay in Ship Construction (Case Study of KM CL 9E Ship Construction). BERKALA SAINSTEK, [S.l.], v. 10, n. 4, p. 235-242, dec. 2022. ISSN 2339-0069. Available at: <https://jurnal.unej.ac.id/index.php/BST/article/view/32674>. Date accessed: 23 nov. 2024. doi: https://doi.org/10.19184/bst.v10i4.32674.